• BigCountry@lemmy.ml
    link
    fedilink
    English
    arrow-up
    2
    ·
    7 months ago

    You must not be familiar with North American power systems. I would bet the op had single phase service providing 220 or 240 volt service. 60 amp service is outdated, 100 amp is basically the minimum and 200 amp is common.

    • the_third@feddit.de
      link
      fedilink
      English
      arrow-up
      2
      ·
      7 months ago

      You must not be familiar with North American power systems. I would bet the op had single phase service providing 220 or 240 volt service.

      Oh, I see. Yeah, well, okay, that’s basically nothing. Seems like the country isn’t really on a good path for electrifying things, then. How do they use any large electric motors at home?

      Living in the boonies - I could get 3 phase, 400V, 100A for 800€, that’s 120kW. Yes, we’re paying a lot per kWh but the grid quality is okay-ish.

    • Peppycito@sh.itjust.works
      link
      fedilink
      English
      arrow-up
      1
      ·
      edit-2
      7 months ago

      You got it. I’m not really familiar with electrical stuff, but I kinda think my service is 110? My dryer and water heater are on separate 2 fuse circuits. I think it was upgraded from aluminum wire in the 70’s. I have the “good” paper wrapped wire now.

      As another cool aside about my house, the sewer line was made of cardboard